Our Scope of Services
-
First Class Seating
-
Business Class Seating
-
Economy Class Seating
-
Cockpit Seating
-
Flight Attendant Seating
-
Dress Covers
-
Cushions
-
Floor Coverings
Certification Paths
EASA POA
EASA DOA
Testing
Dual Release
Installation Support
Cover Production
CNC Cutting
Press Bed Cutting
Lamination
Perforation
Computer Quilting
Emboss & Debossing
Embroidery
Sewing
Cushion Production
3D Renders & Modelling
CNC Cutting
Pressure Mapping
Foam Stock
Parts Production
Parts Assembly
Fireblock Layers
Quality Control
Floor Coverings
-
CAD Floor Plans
-
Stock Carpet
-
Wet Area Flooring
-
CNC Cutting
-
Serging
-
Binding
-
Quality Control
-
Installation
Cockpit Seating
Sheepskin Seat Covers
PMA Parts
Fabric Seat Covers
Leather Seat Covers
Seat Cushions
OEM Material Match
Commercial Aircraft
BIZ Jet
Interested
What our clients say
“We have had contracts with Generation Global since 2016. The reason we went with Generation Global over all other vendors was their responsiveness and short lead times for certification. They have always delivered on promises and when anything is an issue, they are on our doorstep immediately to help. Happy to recommend”.
-
Embraer E175
-
Bombardier CRJ705/900
-
Bombardier CRJ200
-
Bombardier Q400
Case Studies
Mesa Airlines
Project Details
Client:
Mesa Airlines, Phoenix, AZ, USA
Project:
Certify new seat covers and cushions on 3 different seat types.
Certification Requirements:
FAR 25.853 (C) Oil Burner Test TSO C127a 16g compliance TSC C72 Floatation Device
Fleet:
CRJ-900 x 57
Timeframes:
3 months to certify, complete FAI’s and install first shipset.
On Time Within Spec Delivery:
100%
“I’m very happy to recommend Generation Global regarding seat covers and cushions. I was involved in a project during 2022 with very tight timelines and budget this was delivered on time and on budget. This included 16g sled testing and FAI approval. Very impressive”.
Republic Airlines
Project Details
Client:
Republic Airlines, Indianapolis, USA
Project:
Certify and supply new seat covers on 2 different seat types. Ongoing.
Certification Requirements:
FAR 25.853 (C) Oil Burner Test TSC C72 Floatation Device
Fleet:
EMB 175 x 53
Timeframes:
3 months to certify, complete FAI’s and supply first shipset.
On Time Within Spec Delivery:
100%
Malaysia Airlines
Project Details
Client:
Malaysia Airlines, KL, Malaysia
Project:
Certify and supply new seat covers on 3 different seat types.
Certification Requirements:
FAR 25.853 (C) Oil Burner Test TSC C72 Floatation Device
Fleet:
Airbus A330 & A350 fleet
Timeframes:
Current supply
On Time Within Spec Delivery: