Republic Airlines

Fleet: EMB 175 x 53

Project: Certify and supply new seat covers on 2 different seat types. Ongoing.

Certification requirements: FAR 25.853 (C) Oil Burner Test TSC C72 Floatation Device

Time Frames: 3 months to certify, complete FAI’s and supply first shipset.

On Time Within Spec Delivery: 100%

Alliance Airlines

Fleet: 14 x ERJ-190 aircraft, 16 x ERJ-190 aircraft, 21 x ERJ-190 aircraft

Project: Certify and supply new seat covers and cushions for each aircraft delivery.

Certification requirements: FAR 25.853 (C) Oil Burner Test

TSC C72 Floatation Device

TSO C127 Compliance

Time Frames: 2 months to certify, complete First Article Inspections (FAIs), and supply the first shipset.

On Time Within Spec Delivery: 100%

Case Study

“We have had contracts with Generation Global since 2016. The reason we went with Generation Global over all other vendors was their responsiveness and short lead times for certification. They have always delivered on promises and when anything is an issue, they are on our doorstep immediately to help. Happy to recommend”.

– JOSEPH BASILE, DIRECTOR, TECHNICAL
SERVICES& ENGINEERING, JAZZ AVIATION LP.

Mesa Airlines

Fleet: CRJ-900 x 57

Project: Certify new seat covers and cushions on 3 different seat types.

Certification requirements: FAR 25.853 (C) Oil Burner Test
TSO C127a 16g compliance
TSC C72 Floatation Device

Time Frames: 3 months to certify, complete FAI’s and install first shipset.

On Time Within Spec Delivery: 100%

Malaysia Airlines

Fleet: Airbus A330 & A350 fleet

Project: Certify and supply new seat covers on 3 different seat types.

Certification requirements: FAR 25.853 (C) Oil Burner Test TSC C72 Floatation Device

Time Frames: Current supply